The challenge
The Garden Bay Pub struggled with restroom odors due to an older septic system and challenging site conditions. Heat and heavy use in the summer worsened the problem, while strong winter ocean winds caused issues even with low usage. Previous attempts, including raising the vent stacks six feet above the roofline, were unsuccessful.
What was installed
In 2013, two Air Vac ventilation units were installed on the existing vent stacks as a simple test by pressing them into place with no adhesive.
Documented outcome
Despite strong winter winds, the units remained in place through spring 2015. Odors were virtually eliminated, with only occasional issues on busy summer weekends when there was no breeze. The solution required no power or maintenance.
Supporting images
Project gallery
Supporting proof
Documents and related resources
Continue exploring